Skip to content
True Level Remodeling
← All guides

Project story

Seattle Backyard Project: Pavers, Retaining Wall and Shed

How we turned a weedy Seattle backyard into a paver patio with river-rock edges, a 24-inch retaining wall and a storage shed, plus the permit rules.

By Shawn, True Level Remodeling阅读中文版

Our Seattle backyard project near completion: a new square-paver patio running along the side of the house, river-rock strips along the house and the fence, a low block retaining wall and the new metal shed at the back, with tools still on the pavers

In November 2026 we turned a weedy Seattle backyard with no hard surface and no storage into a paver patio with river-rock edges, a block retaining wall about 24 inches high, and an 8 × 12 ft metal storage shed. Work started at the beginning of the month and was finished on November 16, about two weeks, in the middle of the rainy season.

Below is what we built, how each part went together, and the Seattle permit rules for this kind of project.

What did the project include?

Location Seattle, WA (single-family home)
Before Weeds and bare ground; no paved base; no shed
Patio Square concrete paver slabs on a gravel base and a sand setting bed, running the length of the side yard
Edges River-rock strips along the house wall and along the fence
Retaining wall Concrete block, about 24 in high, on a footing of concrete mixed with gravel
Shed 8 × 12 ft metal kit shed on a gravel pad inside a timber frame
Timeline Early November to November 16, 2026

All of the work was done by our crew.

What was the yard like before?

The yard was weeds and soil. There was no paved surface to walk or sit on, no hard edge between the ground and the house, and no shed for tools and garden equipment.

How were the pavers installed?

The patio is built in layers, from the bottom up:

  1. Clear the weeds and prepare the ground so the patio doesn’t sit on plants that will rot and settle.
  2. Gravel base. Crushed gravel goes down to carry the load and let water drain.
  3. Sand setting bed. About an inch of fine sand is spread and leveled on top of the gravel. This is the layer each paver is bedded into.
  4. Lay the pavers. Square paver slabs are set in a straight grid. A string line keeps the courses straight and levels check the surface as it goes, which you can see in the photo above.
  5. Edges. Edging holds the outside pavers in place so the patio doesn’t spread over time. River rock fills the strips beside the house and the fence.

Why river rock along the house?

A strip of rock next to the foundation keeps soil and bark away from the siding, lets roof and surface water soak in rather than puddle against the wall, and stops mud from splashing up in heavy rain. It also needs almost no upkeep compared with a planting bed.

What does a good paver base look like?

A paver patio is only as good as what’s underneath it. Here is general industry guidance. Use it as a reference, not a fixed spec, because the right depth depends on the soil and the load:

  • Base depth: Concrete Network notes that base thickness “normally ranges from 6-inches to 12-inches,” and that “on the West, many jobs are done with 4-6” base material” (Concrete Network, How to Install Concrete Pavers, checked November 2026). Wet, soft or clay soils call for more.
  • Compaction in layers: the base is installed and compacted in lifts of “no more than 4-inches at a time,” to at least 95 percent Proctor density for pedestrian areas and residential driveways.
  • Setting bed: “a 1-inch to 1 1/2-inch layer of sand” over the compacted base.
  • Edge restraint around the perimeter so the pavers can’t creep outward.
  • Slope the surface slightly away from the house so water runs off rather than toward the foundation.

How was the retaining wall built?

The wall at the back of the yard holds the higher ground behind the patio. It is about 24 inches high, built from concrete block on a footing of concrete mixed with gravel, so the bottom course sits on a solid, level base instead of loose soil. A level first course matters more than anything else in a block wall: every course above it follows.

How was the shed set up?

The shed is an 8 × 12 ft metal kit. Before assembly we built a gravel pad inside a timber frame so the shed sits level and off the wet ground, with water able to drain away underneath.

The shed base before assembly: a rectangular timber frame filled with gravel in the cleared backyard, with the shed kit’s boxes around it

The walls and roof framing then go up panel by panel on that base.

The metal shed partly assembled on its gravel pad, with the walls up and roof framing in place, and packaging from the kit in the foreground

Can you do this kind of work in Seattle’s rainy season?

Yes, with some care. We built this project in November. General good practice for paving in wet weather:

  • Keep the bedding sand dry and covered. Saturated sand doesn’t screed or compact evenly.
  • Don’t lay pavers on standing water. Pause during heavy rain and let the base drain.
  • Protect the open ground. Cover stockpiles and bare soil so rain doesn’t wash fines into the base or onto the neighbors’ property.

Dry spells between showers are usually enough to keep a project like this moving.

Do you need a permit for a patio, retaining wall or shed in Seattle?

Often not, but it depends on size and location. Seattle’s Department of Construction and Inspections (SDCI) gives these rules (all checked November 2026):

  • Patios: “Patio and concrete slabs on the ground (on grade)” usually don’t need a permit. But “a grading permit is required if you add or replace 750 square feet (75 feet by 10 feet) or more of paving” (SDCI, Paving; SDCI, Do You Need a Permit?).
  • Retaining walls: no construction permit if the wall is “4 feet or lower in height as measured from the bottom of the footing (even if under grade) to the top of the wall,” the parcel has no environmentally critical area, and the wall won’t damage neighboring property. SDCI notes that a wall at the property line may need a permit (SDCI, Retaining Walls & Rockeries).
  • Sheds: no permit if the roof footprint is “120 square feet or less,” it’s one story, sits on a simple slab, pier blocks or soil, isn’t attached to the house, isn’t in or near an environmentally critical area, and is used for storage (SDCI, Sheds).

Building in Bellevue instead? The rules are different; see our Bellevue permit guide.

Frequently asked questions

How long does a backyard project like this take? This one took about two weeks from the start of work to completion. Size, access, soil, weather and how much digging is needed all change the timeline.

Is an 8 × 12 shed exempt from a permit in Seattle? The floor is 96 square feet, but SDCI measures the roof footprint, including overhangs, against the 120-square-foot limit. Check the kit’s roof dimensions and your lot before you buy.

Can pavers go straight on top of the grass or weeds? No. Plants and topsoil rot and settle, and the pavers sink unevenly. They need to be excavated and replaced with a gravel base and a sand setting bed.

Planning a backyard project?

We give free on-site estimates for outdoor living projects in Bellevue, Seattle and the Eastside: patios, retaining walls, sheds and more. We’ll look at the ground, the drainage and the permit rules for your lot and give you a written, itemized quote. Request your free estimate.

CallFree estimate