Removing a Wall for an Open Kitchen in Bellevue, WA
Planning an open kitchen in Bellevue, WA? See how to tell a load-bearing wall, what's inside it, which permits apply and what to plan for.
By Shawn, True Level Remodeling阅读中文版

Removing a non-bearing kitchen wall in Bellevue usually needs only a simple permit that can often be issued the same day. Removing a load-bearing wall means replacing it with a beam, and that needs structural plans and city plan review, which took a median of about 2 weeks over the past year.
Either way, the wall is rarely empty. Pipes, vents, ducts and wiring inside it often decide the scope and cost more than the drywall does.
What changes if the wall is load-bearing?
A load-bearing wall holds up part of the house above it, so it can only come out if a beam takes over its job:
| Non-bearing wall | Load-bearing wall | |
|---|---|---|
| What it does | Divides rooms | Carries floor, ceiling or roof loads |
| Bellevue permit | Building permit without plan review (BT) | Single-family remodel permit with plan review (BU) |
| Plans needed | Usually none for the wall itself | Structural plans: beam, posts, footings, connections |
| City review | Often issued the same day | Median ~13 days, average ~34 days (last 12 months) |
| Typical work | Demolition, patching, rerouting what’s inside | All of that, plus temporary support, a beam and new posts down to the foundation |
The city says no-plan-review permits are for nonstructural work and lists “removing, relocating or installing non-bearing walls” as an example. Projects that “require the removal or relocation of bearing walls or structural members” are outside that permit (Building permits, no plan review, checked November 2026). The remodel permit with plan review covers “replacing a load-bearing wall with a beam” (Single-Family Remodel Permit, checked November 2026). Review times are from Bellevue’s Permit Processing Timelines report for single-family remodel plan reviews completed November 16, 2025 to November 16, 2026.
How can you tell if a kitchen wall is load-bearing?
You can spot the likely signs yourself, but only a contractor or structural engineer looking at the framing can confirm it. Clues that a wall is probably carrying load:
- Joists run across it. In the attic or the basement, floor or ceiling joists that run perpendicular to the wall and rest on it, or overlap above it, usually mean it’s bearing.
- Something sits directly above or below it. A wall on the floor above, or a beam, girder or post line in the basement or crawl space under it.
- It runs down the middle of the house. In many older one- and two-story homes, a central wall carries the ceiling joists.
- It’s an exterior wall. Outside walls almost always carry the roof.
A wall can still be bearing without these clues, and some interior walls also help brace the house against wind and earthquakes. That’s why the answer should come from opening a small inspection hole and having a professional look, not from the direction of the joists alone.
What’s usually inside a kitchen wall?
Kitchen walls are some of the busiest in the house. Before demolition, plan for:
- Plumbing drains and vents. A sink on one side of the wall often means a drain and a vent pipe running up through it. Vent stacks are the hardest to move because they have to stay connected to the roof vent.
- Gas lines for a range or cooktop.
- Heating ducts and returns. Older forced-air homes often run a duct or a return in an interior wall.
- Electrical circuits, switches and outlets, sometimes for both rooms.
Each of these triggers its own permit in Bellevue if it moves. The city requires a permit “for adding or moving electrical circuits,” for “installing a new gas line or modifying an existing line,” and to move a fixture when it means changing “water lines, drains or vents” (Work Requiring Permits, checked November 2026). On a remodel permit with plan review, the electrical, mechanical and plumbing work is included.
What does replacing a wall with a beam involve?
Replacing a bearing wall is a structural project in a few clear stages:
- Assess. Open the wall or ceiling where needed to see the framing and what’s inside.
- Design. A structural engineer usually sizes the beam, the posts at each end and any new footings. Bellevue’s structural plan requirements ask for design loads, beam grades, metal connectors and, where relevant, shear wall and hold-down details (Structural Plan Requirements, checked November 2026).
- Permit. Submit plans for the remodel permit; the plan reviewer may ask for changes.
- Shore. Temporary walls hold up the floor or ceiling above while the old wall comes out.
- Install. The beam goes in, either flush (hidden in the ceiling, with the joists hung from it) or dropped (below the ceiling, which is usually simpler but visible). The load has to travel down through posts to solid support, which sometimes means new footings in the basement or crawl space.
- Inspect and close up. Framing is inspected before it’s covered, then the ceiling, walls and floor are patched.
The structural part often takes days, not weeks. Patching, flooring, electrical and finishes take longer. These are typical patterns, not promises.
What permits and inspections does Bellevue require?
Plan for two things beyond the building permit:
- Inspections. Even a no-plan-review permit requires a pre-construction meeting with the inspector before work starts, an inspection before framing or insulation is covered, and a final. If the inspector finds the work is bigger than that permit allows, the city requires plans, and “plan review may involve a three-week turnaround time” (Bellevue, no-plan-review permit page).
- Asbestos. Washington’s Department of Labor & Industries says that “you must identify asbestos before starting any renovation, remodeling, repair, maintenance, or demolition project” (L&I, Asbestos, checked November 2026). In older homes, wall joint compound, ceiling texture and old flooring are common places to check. Our guide to remodeling an older Bellevue home explains who can do the survey.
For a wider list of what needs a permit, see our Bellevue permit guide.
What gets overlooked when opening a kitchen?
The details at the edges of the old wall decide how finished the new space looks:
- The floor. Where the wall stood, there’s a strip with no flooring. Matching old hardwood or tile is hard, so many owners refloor both rooms.
- The ceiling. Two different ceiling heights or textures now meet.
- Lighting and switches. Switches on the old wall need a new home, and the bigger room usually needs a new lighting plan.
- Cabinet layout. You lose wall cabinets and an appliance wall. An island often replaces that storage and needs power, and sometimes plumbing.
- Ventilation. An open kitchen sends cooking smells and grease into the living area. Bellevue lists 100 cfm as the minimum exhaust for a remodeled kitchen under the residential code (no-plan-review permit page), but heavy cooking needs more. See choosing a range hood for Chinese cooking.
When is the best time to open up a kitchen?
The rainy season works well. The work is indoors, and design, engineering and permit review can happen over the winter so construction starts on schedule. Opening a wall is usually part of a larger kitchen remodel; our kitchen remodel timeline shows how the phases fit together.
Frequently asked questions
Can I remove a load-bearing wall myself? It’s structural work that needs a permit with plan review, temporary support and a correctly sized beam. Mistakes can crack ceilings or cause sagging floors upstairs. Hire a contractor, and have an engineer size the beam.
Do I need an engineer to remove a non-bearing wall? Usually not. But someone qualified should confirm it really is non-bearing before it comes out.
Can I keep part of the wall? Yes. A half wall, a wider opening or a peninsula can keep a post or plumbing in place and cut cost while still opening the room.
Plan your open kitchen with us
We give free on-site estimates for kitchen remodeling in Bellevue and the Eastside. On the visit we look at the wall you want to remove, check for signs it’s bearing and what runs through it, and give you a written, itemized quote that lists scope, permits and schedule line by line. Request your free estimate.